Hartsfield-Jackson Atlanta International Airport: APRAM
Service Details
Surveying
SEI performed asbuilt and topographic surveys of existing conditions along Taxiway Dixie/Golf in order to provide accurate excavation plans prior to construction. Construction layout along the taxiway included slope staking and layout of the proposed glycol and electrical lines. Asbuilt and topographic surveys were performed post construction to verify grade and installation of utilities. Establishment and verification of existing site control was required to maintain continuity with other airport work sites.