City of East Point: Storm Water Infrastructure Analysis Survey
SEI gathered information on storm water conveyance systems at sixty five points for the 2007 work and ninety five locations for the 2010 work throughout the City’s boundaries in order to aid in storm water modeling. Road culverts, bridges, catch basins, headwalls junction boxes and the associated piping were located utilizing conventional and GPS methods. The information was then post processed and drawn in CAD format to submit to the City’s Engineer, CDM, for modeling.