Hartsfield-Jackson Atlanta International Airport: C4 Fiber Optic Duct Bank

SEI performed asbuilt and topographic surveys of existing conditions in order to provide accurate excavation plans prior to construction. SEI then performed layout of all manholes along the duct bank for construction. As construction progressed, SEI performed as-built surveys on all newly constructed manholes along with location and depth of the duct bank being installed...

Hartsfield-Jackson Atlanta International Airport: APRAM

SEI performed asbuilt and topographic surveys of existing conditions along Taxiway Dixie/Golf in order to provide accurate excavation plans prior to construction. Construction layout along the taxiway included slope staking and layout of the proposed glycol and electrical lines...

Hartsfield-Jackson Atlanta International Airport: ALSF-2 Runway 27L

The staking of lighting foundations was especially critical due to horizontal and vertical tolerances. Establishment and verification of existing site control was required to maintain continuity with other airport projects. In this case, published plan coordinates did not match existing site conditions requiring further information and adjustment...

Hartsfield-Jackson Atlanta International Airport: Concourse-E

As a Joint Venture partner with the Jervis B. Webb Company, JBW/SEI is providing the design, integration, manufacture and installation of the new baggage handling conveyor system as part of the new Maynard H. Jackson Jr. International Terminal project for the City of Atlanta. SEI has provided 3D laser scanning, clash detection and header steel design services within Hartsfield-Jackson Atlanta International Airport Concourse E to support the baggage handling system reconfiguration...

Hartsfield Jackson Atlanta International Airport: New International Terminal Roadway

This new roadway replaces Aviation Boulevard and will lead to the new international terminal. It consists of multiple travel lanes including elevated pre-cast and cast-in-place roadways and service roads. Establishing accurate, reliable and recoverable control for this project is paramount. Due to the longevity of the project, installation and preservation of control is a key component and SEI has taken steps to insure reliability and repeatability of the primary survey control...